Wednesday, January 21, 2009

MV Beagle I Kwang Yang Korea to Kuantan

We loaded 446 pieces of steel tubulars (pipes) / 2,765.53/ 3,852.77CBM on MV Beagle 1 ex Kwang Yang, Korea to Kuantan, Malaysia.

Name of Ship : MV Beagle 1
Owners on ship registry certificate : Beagle Wisdom S.A
Year Built: 2005
LOA : 129.90m
Depth (Moulded) : 16.00m
Gross Reg. Tons/Net Reg. Tons: Gross 12,630/Net 5,054
Number of Hatches/Holds : 2 Hatches/2 Holds
Type of Hatch Covers : Single Pull Type
Cargo Gear : 30MT Derrick x 2 sets & 30 MT Crane x 2 sets
Hatch Size
No. 1 : 33.00m x 15.00m (Upper) 9.75m x 13.50m/23.25m x 16.00m (Lower)
No. 2 : 33.00m x 15.00m (Upper) 3.75m x 13.50m/29.25m x 16.00m (Lower)

Loading operation start at about 21000 hours on January 15,2009 and was completed at about 0010 hours on January 17, 2009 and securing was completed at about 0100 hours on January 17,2009.





MV Beagle 1 at Jungma General Pier,
Kwang Yang, Korea














View of pipe being load by ship crane












Vessel Crane hooking pipe safely







All the pipe load and lashed for secure journey
to P.Gudang




Vessel schedule eta P.Gudang 29.01.2009 AGWWP....